System and Infrastructure Status News
Bridges-2 Migration Scheduled Downtime: November 9 Through December 2026
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: bridges2-em.psc.access-ci.org, bridges2-gpu.psc.access-ci.org, bridges2-rm.psc.access-ci.org, bridges2-ocean.psc.access-ci.org, neocortex-sdflex.psc.access-ci.org
Start Date (Central Time): November 9, 2026, 8:00 a.m.
End Date (Central Time): December 14, 2026, 11:00 a.m.
Dear Bridges-2 Users,
This is a reminder that the Bridges-2 migration is expected to begin:
November 9, 2026
The system will be unavailable for approximately 4–6 weeks.
Key actions:
- Complete data backups by: November 1, 2026
- Avoid delaying transfers—bandwidth is shared
- Ensure workloads do not extend into the outage
PSC cannot guarantee complete data integrity through the relocation. As a reminder, the Ocean filesystem is never backed up, so as a best practice, we strongly recommend our users maintain offsite backups of important data.
For full details, timelines, and preparation guidance, please visit: Bridges-2 Migration Information Page
As always, if you have questions about the migration, your data, or workload planning, please contact the PSC Help Desk at help@psc.edu. We are happy to help you prepare.
Thank you,
Bridges-2 Team
Posted: October 12, 2026 • Author: Tom Maiden
Purdue Anvil CPU and AI nodes unavailable On November 16-18, 2026
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: anvil-ai.purdue.access-ci.org, anvil.purdue.access-ci.org, anvil-cloud.purdue.access-ci.org
Start Date (Central Time): November 15, 2026, 10:00 p.m.
End Date (Central Time): November 18, 2026, 12:00 a.m.
The Anvil CPU and AI (Nvidia H100 GPUs) nodes will be unavailable during a planned outage on Monday, November 16, at 4:00 a.m. through Wednesday, November 18, at 6:00 a.m. EST, to complete some maintenance that cannot be delayed.
The Anvil login and GPU nodes (Nivdia A100 GPUs), along with AnvilGPT, Anvil Notebook, and storage will stay online.
How Does This Affect You?
Anvil CPU and AI nodes, along with Anvil Composable, will be unavailable during all outage windows. Jobs on CPU and AI nodes will not run, and new jobs to CPU and AI nodes will not start while they are offline. Jobs on CPU and AI nodes that cannot be completed before an outage begins will not start. They will remain in the queue until these nodes returns to service.
Any Questions?
If you have questions about these outages or need assistance, please submit a ticket through the ACCESS Help Desk.
Posted: November 4, 2026 • Author: Nannan Shan
(Canceled) Anvil Outage On November 6-8, 2026
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: anvil-ai.purdue.access-ci.org, anvil.purdue.access-ci.org, anvil-gpu.purdue.access-ci.org
Start Date (Central Time): November 6, 2026, 5:00 p.m.
End Date (Central Time): November 8, 2026, 6:00 p.m.
Updates (October 29, 2026):
The Anvil outage planned for November 6-8, 2026 is canceled. All affected resources will stay in normal service through those dates.
The outage is being rescheduled for early December. We’ll send the new dates as soon as the dates are confirmed, with enough notice for you to plan ahead.
Original post (October 28, 2026)
The Anvil clusters and services will be unavailable during a planned outage on Friday, November 6, at 5:00 p.m. through Sunday, November 8, at 6:00 p.m. EST, to complete the remaining power and facility work for datacenter improvement projects.
How Does This Affect You?
Anvil CPU, GPU, and AI nodes, along with AnvilGPT, Anvil Notebook, Anvil Composable, and storage, will be unavailable during all outage windows. Jobs will not run, and new jobs will not start while Anvil is offline. Jobs that cannot be completed before an outage begins will not start. They will remain in the queue until Anvil returns to service.
Any Questions?
If you have questions about these outages or need assistance, please submit a ticket through the ACCESS Help Desk.
Posted: October 26, 2026 • Author: Nannan Shan
SDSC Expanse: 2FA enrollment site unavailable
PublishedInfrastructure News Type: Degraded
Affected Infrastructure: expanse.sdsc.access-ci.org, expanse-gpu.sdsc.access-ci.org
Start Date (Central Time): October 23, 2026, 7:00 p.m.
End Date (Central Time): October 27, 2026, 7:00 p.m.
Dear Expanse Users,
The SDSC 2FA enrollment management site (https://passive.sdsc.edu) is currently unavailable. This impacts users needing to enroll in Expanse 2FA. There is no estimate for a return to service at this time. We will send an update once the site is available again.
We apologize for the inconvenience. In the interim, new Expanse users are requested to login via the Expanse portal (https://portal.expanse.sdsc.edu) where you can use ACCESS CI as the organization and use your ACCESS credentials (with DUO for 2FA).
Thanks
SDSC User Services Staff
Posted: October 26, 2026 • Author: Mahidhar Tatineni
Operation Portal brief urgent maintenance outage on 2026-10-21
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: operations.access-ci.org
Start Date (Central Time): October 21, 2026, 10:00 a.m.
End Date (Central Time): October 21, 2026, 10:05 a.m.
There was a brief 5/minute outage of the Operations Portal (https://operations.access-ci.org) at 10 AM Central on October 21, 2026, to apply an urgent security update.
Posted: October 22, 2026 • Author: John-Paul Navarro
[Resolved] EMERGENCY POWER SHUTDOWN - ALL PURDUE RCAC SYSTEMS WERE UNAVAILABLE
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: anvil-ai.purdue.access-ci.org, anvil.purdue.access-ci.org, anvil-gpu.purdue.access-ci.org
Start Date (Central Time): October 21, 2026, 5:30 p.m.
End Date (Central Time): October 22, 2026, 10:30 a.m.
Update:
As of October 22, 2026 11:20am EDT. Power has been restored and all Anvil services have been brought back online. Questions or concerns, please submit an ACCESS help ticket via https://support.access-ci.org/help-ticket.
What happened: On the afternoon of October 21, a section of electrical equipment (a busway) supplying our data center was found to be overheating. To prevent damage and ensure safety, we shut down the systems it powered, and Purdue Utilities de-energized its feed. Electricians then repaired the equipment and safely restored power, and our team has brought all systems back up.
Original Post:
October 21, 2026 06:37pm EDT
Due to an issue with the new power distribution system in our data center, our contractor had to shut down power to a number of RCAC systems this afternoon. The outage has now expanded to include all RCAC systems, including Anvil.
To restore power as quickly as possible, the contractor will shut down everything in the MATH G109/G190 data center and then bring it back up on the newly installed power bus. This means all clusters and all storage, including Depot, will be powered off.
What this means for you:
- All RCAC clusters are unavailable. Jobs that were running have been or will be stopped and will need to be resubmitted once service is restored. This includes interactive sessions such as OnDemand desktops and Jupyter.
- All storage systems, including Depot, will be powered off during the transition, so files, Globus endpoints, and other services will not be accessible until systems are restored.
- We do not have an estimated time of return to service. Bringing everything back up on the new power bus will take time.
Posted: October 22, 2026 • Author: Guangzhen Jin
ACCESS XDMoD Full Outage
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: xdmod.access-ci.org
Start Date (Central Time): October 21, 2026, 10:00 a.m.
End Date (Central Time): October 21, 2026, 6:00 p.m.
10/22/26 - The update is complete and ACCESS XDMoD is available.
ACCESS XDMoD will be unavailable for a couple hours today starting at 10:00 AM EST while we fix a security vulnerability. An update will be posted when the service is available again.
Posted: October 21, 2026 • Author: Conner Saeli
ACCESS XDMoD Full Outage
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: xdmod.access-ci.org
Start Date (Central Time): September 29, 2026, 5:16 p.m.
End Date (Central Time): September 30, 2026, 3:30 p.m.
EDIT: The issue has been fixed and ACCESS XDMoD is back up.
ACCESS XDMoD is currently experiencing a full outage. The Metrics team is working on a fix.
Posted: September 30, 2026 • Author: Aaron Weeden
SDSC Expanse: Maintenance, 8AM-Noon (PT), Monday, 10/05/2026
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: expanse.sdsc.access-ci.org, expanse-gpu.sdsc.access-ci.org, expanse-ps.sdsc.access-ci.org
Start Date (Central Time): October 5, 2026, 10:00 a.m.
End Date (Central Time): October 5, 2026, 2:00 p.m.
Dear Expanse User,
We will be performing maintenance on the Expanse Lustre filesystem 8AM-Noon (PT), Monday, 10/05/2026. There is a reservation in place to prevent jobs from running during this maintenance period. The "squeue" output will show "ReqNodeNotAvail, Reserved for maintenance" for jobs that do not fit in the time period before the maintenance begins. These jobs will run after we release the maintenance reservation.
Thanks
SDSC User Services Staff
Posted: September 30, 2026 • Author: Mahidhar Tatineni
Operations API scheduled maintenance
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: dashboard.operations.access-ci.org
Start Date (Central Time): September 29, 2026, 6:00 p.m.
End Date (Central Time): September 29, 2026, 6:30 p.m.
The Operations API server (operations-api.access-ci.org) will be down from 6:00pm to 6:30pm CDT on Tuesday, September 29th, 2026 for a scheduled maintenance activity. This means that services that depend on APIs offered by Operations API may not operate as expected in this window. This includes, but is not limited to the Integration Badges Dashboard.
Posted: September 29, 2026 • Author: Eric Blau
Jetstream2 Scheduled Maintenance: 10-6-26
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: jetstream2-gpu.indiana.access-ci.org, jetstream2-lm.indiana.access-ci.org
Start Date (Central Time): October 6, 2026, 7:00 a.m.
End Date (Central Time): October 6, 2026, 7:00 p.m.
On October 6, 2026, the Jetstream2 engineering team will begin performing routine maintenance. This may result in brief service interruptions affecting Jetstream2 GPU and Large Memory resources.
The maintenance window will be from Tuesday, October 6 from approximately 7AM–7PM ET. This maintenance is necessary to apply necessary firmware and package updates that ensure the continued stability and performance of our infrastructure.
Existing GPU and Large Memory instances will be intermittently unavailable. Standard CPU instances will not be affected.
There will also be changes to the Jetstream2 LLM Inference Service. The Llama 4 Scout model will be retired, and the Gemma 4-31B model will be introduced during this maintenance.
Quick Summary
- Window starts: October 6, 2026 @ 7AM ET
- Window ends: October 6, 2026 @ 7PM ET (estimated)
- Affected resources: GPU and Large Memory instances; Inference Service
- Unaffected resources: CPU only, Storage
- Take action: Save work prior to maintenance window
Included In This Maintenance
- All GPU and Large Memory hypervisors will be updated and rebooted
- Jetstream2 Inference Service will see retirement of Llama 4 Scout model and introduction of Gemma 4-31B model
Expected Impact
- Existing GPU instances and new launches may be intermittently unavailable as hypervisors are rebooted
- Llama 4 Scout will no longer be available
Required Action
All unshelved GPU and Large Memory instances will be restarted as hypervisors are restarted. They will be returned to their active states. To prevent potential data loss from unsaved processes, we strongly recommend that you save all work and stop any running processes before the window begins.
We appreciate your patience as we improve the Jetstream2 environment. If you have any questions or concerns, please contact Jetstream2 Support at help@jetstream-cloud.org.
Posted: September 28, 2026 • Author: Jennifer Armstrong
SDSC Expanse: Home filesystem issues
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: expanse.sdsc.access-ci.org, expanse-gpu.sdsc.access-ci.org
Start Date (Central Time): September 28, 2026, 2:00 p.m.
End Date (Central Time): September 28, 2026, 4:00 p.m.
>>>> Update 1
Dear Expanse User,
The home directory server issues were fixed earlier today around 2PM (PT). We are continuing to monitor the filesystems and will follow up as needed.
Thanks
SDSC User Services Staff
>>>>
Dear Expanse User,
We are currently seeing some issues with one of the home directory filesystems on Expanse. This is causing login problems on both the login nodes. We will update once the issue is resolved.
Thanks
SDSC User Services Staff
Posted: September 28, 2026 • Author: Mahidhar Tatineni
ACCESS XDMoD Partial Downtime
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: xdmod.access-ci.org
Start Date (Central Time): September 23, 2026, 4:00 p.m.
End Date (Central Time): September 24, 2026, 5:00 p.m.
ACCESS XDMoD will be undergoing a partial downtime from 4:00PM EDT on September 23rd until about 5:00PM EDT on September 24th. During this time, the XDMoD portal and the Metrics portal will be unavailable. This downtime is a necessary continuation of the site's backend infrastructure migration. During this time services such as the XDMoD portal and Data Analytics Framework Notebooks may be unavailable.
Posted: September 23, 2026 • Author: Conner Saeli
Delta and DeltaAI brief scheduler and OnDemand outage on Monday, September 14
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: delta-cpu.ncsa.access-ci.org, delta-gpu.ncsa.access-ci.org, delta.ncsa.access-ci.org
Start Date (Central Time): September 14, 2026, 8:00 a.m.
End Date (Central Time): September 14, 2026, 9:00 a.m.
The job scheduler and Open OnDemand on Delta and DeltaAI will be undergoing maintenance this coming Monday, September 14, 8:00-9:00am.
The scheduler will likely undergo two extended outages during this time period. During those outages Slurm commands will not work so users will be unable to submit new jobs, query the queue, etc. and new jobs will not start.
Open OnDemand will also be unavailable for an extended period of time. Running app instances should continue running on their compute nodes during the outage but the UI will not be accessible.
For questions and comments, or if you experience anything unusual after the updates, please contact us via the NCSA Help portal (https://help.ncsa.illinois.edu) or by email to help@ncsa.illinois.edu.
Posted: September 12, 2026 • Author: Gregory Bauer
ACCESS XDMoD Downtime
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: xdmod.access-ci.org
Start Date (Central Time): September 9, 2026, 8:00 p.m.
End Date (Central Time): September 10, 2026, 12:00 a.m.
UPDATE: The downtime has been pushed back to 8:00PM EDT on September 9th until about 12:00AM EDT on September 10th.
ACCESS XDMoD will be undergoing a full downtime at which time the XDMoD portal and the Metrics portal will be unavailable. The outage is necessary to migrate some of the backend infrastructure for the sites.
Posted: September 1, 2026 • Author: Conner Saeli
Jetstream2 Scheduled Maintenance: September 1, 2026
PublishedInfrastructure News Type: Outage Partial
Affected Infrastructure: jetstream2-gpu.indiana.access-ci.org
Start Date (Central Time): September 1, 2026, 7:00 a.m.
End Date (Central Time): September 1, 2026, 7:00 p.m.
On September 1, 2026, the Jetstream2 engineering team will begin performing routine maintenance. This may result in brief service interruptions affecting Jetstream2 GPU resources.
The maintenance window will be from Tuesday, September 1 from approximately 7AM–7PM ET. This maintenance is necessary to apply critical security and software updates that ensure the continued stability, security, and performance of our infrastructure.
Existing GPU instances will be intermittently unavailable. CPU and Large Memory instances will not be affected.
Quick Summary
- Window starts: September 1, 2026 @ 7AM ET
- Window ends: September 1, 2026 @ 7PM ET (estimated)
- Affected resources: GPU instances
- Unaffected resources: CPU-only, Large Memory, Storage
- Take action: Save work prior to maintenance window
Included In This Maintenance
- Security updates: All GPU hypervisors will be updated and rebooted
- Software updates: Updated NVIDIA vGPU driver on Featured Images to version 580.159
- Any new g3.medium or g3.larges created after maintenance will have the new driver installed.
- Existing instance drivers can be updated from the software store.
Expected Impact
- Instance availability: GPU instances may be intermittently unavailable as hypervisors are rebooted
Required Action
All unshelved/running instances will be restarted. To prevent potential data loss from unsaved processes, we strongly recommend that you save all work and stop any running processes before the window begins.
We appreciate your patience as we improve the Jetstream2 environment. If you have any questions or concerns, please contact Jetstream2 Support at help@jetstream-cloud.org.
Posted: August 28, 2026 • Author: Jennifer Armstrong
TAMU ACES Maintenance, August 25
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: aces.tamu.access-ci.org
Start Date (Central Time): August 25, 2026, 9:00 a.m.
End Date (Central Time): August 25, 2026, 8:45 p.m.
The maintenance was concluded at 8:45p.
The scheduled maintenance is in progress.
The TAMU ACES cluster will be unavailable from 9a to 8p CDT Tuesday August 25, 2026 for regular and storage maintenance.
Posted: August 18, 2026 • Author: Francis Dang
TAMU ACES Storage Degradation
PublishedInfrastructure News Type: Degraded
Affected Infrastructure: aces.tamu.access-ci.org
Start Date (Central Time): August 14, 2026, 8:38 p.m.
End Date (Central Time): August 14, 2026, 10:00 p.m.
The storage has been recovered from the degradation.
The storage for the TAMU ACES cluster is currently degraded due to a software issue. While we attempt to recover from the issue, there may be intermittent access to the filesystems on ACES.
Posted: August 15, 2026 • Author: Francis Dang
TAMU Launch Maintenance, August 18
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: launch.tamu.access-ci.org
Start Date (Central Time): August 18, 2026, 9:00 a.m.
End Date (Central Time): August 18, 2026, 6:00 p.m.
The TAMU Launch maintenance on August 18, 2026 has been completed.
Previous messages:
The TAMU Launch maintenance on August 18, 2026 has started.
The TAMU Launch cluster will be unavailable from 9a to 8p CDT, Tuesday, August 18, 2026 for regular and storage maintenance.
Posted: August 10, 2026 • Author: Tsung-i Huang
(Completed) Upcoming Anvil Outage on September 19-21, 2026
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: anvil-ai.purdue.access-ci.org, anvil.purdue.access-ci.org, anvil-gpu.purdue.access-ci.org
Start Date (Central Time): September 19, 2026, 11:00 p.m.
End Date (Central Time): September 21, 2026, 3:00 p.m.
Updates (September 21, 2026):
The scheduled maintenance on Anvil has been successfully completed as of 3:37 pm EDT. All services are now available. The queues have been enabled and jobs have resumed scheduling. If you encounter any issues following this maintenance, please contact Anvil team through ACCESS Help Desk.
Updates (September 18, 2026):
This is a reminder that Anvil is scheduled for a power outage and maintenance starting tomorrow, Saturday, September 19, at 12:00 a.m. through Monday, September 21, at 8:00 p.m. EDT.
Updates (September 10, 2026):
This is a reminder that Anvil is scheduled for a power outage and maintenance on Saturday, September 19, at 12:00 a.m. through Monday, September 21, at 8:00 p.m. EDT.
Updates (August 13, 2026):
The power outage originally scheduled for Saturday, August 15, at 12:00 a.m. through Monday, August 17, at 5:00 p.m. EDT has been cancelled, therefore Anvil remains available during this time.
Anvil is still scheduled for a power outage and maintenance on Saturday, September 19, at 12:00 a.m. through Monday, September 21, at 8:00 p.m. EDT.
Original post (August 7, 2026):
The Anvil clusters and services will be unavailable during two scheduled maintenance events in August and September to support datacenter improvement projects that require power outages.
The first power outage is scheduled for Saturday, August 15, at 12:00 a.m. through Monday, August 17, at 5:00 p.m. EDT.
The second power outage and Anvil maintenance are scheduled for Saturday, September 19, at 12:00 a.m. through Monday, September 21, at 8:00 p.m. EDT.
The Anvil quarterly maintenance previously announced for August 25 has been cancelled, and Anvil will remain available on August 25.
How Does This Affect You?
Anvil CPU, GPU, and AI nodes, along with AnvilGPT, Anvil Notebook, Anvil Composable, and storage, will be unavailable during all outage windows. Jobs will not run, and new jobs will not start while Anvil is offline. Jobs that cannot be completed before an outage begins will not start. They will remain in the queue until Anvil returns to service.
Any Questions?
If you have questions about these outages or need assistance, please submit a ticket through the ACCESS Help Desk.
Posted: August 7, 2026 • Author: Nannan Shan
(Cancelled) Anvil Scheduled Maintenance August 25, 2026
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: anvil-ai.purdue.access-ci.org, anvil.purdue.access-ci.org, anvil-gpu.purdue.access-ci.org
Start Date (Central Time): August 25, 2026, 7:00 a.m.
End Date (Central Time): August 25, 2026, 5:00 p.m.
Updates:
The maintenance for Anvil on August 25, 2026 has been cancelled. Anvil will remain available on August 25, 2026.
Original post:
The Anvil cluster will be unavailable on Tuesday, August 25, 2026, from 8:00 AM to 5:00 PM EDT while scheduled maintenance is performed. During this maintenance window, we will update the operating system and kernel, storage and file systems, system drivers, and software packages.
Any Slurm job requesting a walltime that extends beyond Tuesday, August 25, at 8:00 AM EDT will not start and will remain in the queue until the maintenance is complete.
Anvil is expected to return to full production by Tuesday, August 25, 2026, at 6:00 PM EDT.
Please submit a ticket through ACCESS Help Desk if you have any questions.
Posted: August 7, 2026 • Author: Nannan Shan
SDSC Expanse home directory and login issues [Resolved]
PublishedInfrastructure News Type: Outage Full
Affected Infrastructure: expanse.sdsc.access-ci.org, expanse-gpu.sdsc.access-ci.org, expanse-ps.sdsc.access-ci.org
Start Date (Central Time): July 27, 2026, 12:30 p.m.
End Date (Central Time): July 27, 2026, 2:00 p.m.
>>>>> Update 1
Dear Expanse User,
The Expanse home directory issue was resolved yesterday (7/27/26) and we are continuing to monitor the servers. We will follow up as needed if there are any issues.
Thanks
SDSC User Services Staff
>>>>>>>
Dear Expanse User,
We had a problem with the Expanse home directory servers this morning and that impacted filesystem accessibility and logins to the system. We will update once the issue is resolved.
Thanks
SDSC User Services Staff
Posted: July 27, 2026 • Author: Mahidhar Tatineni